The Constructor

Labor Requirement for Various Construction Works

Reading time: 1 minute

The cost of construction project highly depends on the requirements of labor for various activities during construction.

There are direct and indirect costs associated with the labor. They are the salary of labors, their accommodation, food, insurance cost etc. Thus it is essential to understand the number labors required for each activity of the construction to estimate the final cost of project.

Labor Requirement for Various Construction Works

There are different types of labors that are required for the construction:

All these types of labors have different skills and different salaries. Their optimum use in every work in construction is essential to minimize the construction cost.

The table below shows the recommended labor requirement for various civil engineering/building/construction works:

S.

 

No.

Description of workUnitLaborRecommended constant in days.
1)Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge)M3Mate

 

Labor

0.06

 

0.62

2)Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge)M3Mate

 

Labor

0.05

 

0.50

3)Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50mM3Mate

 

Labor

Bhisti

0.02

 

0.25

0.02

4)Concrete :

 

Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate)

M3Labor

 

Bhisti

Mixer operator

Mixer

0.50

 

0.10

0.07

0.07

5)Mixer mixed cement concreteM3mason

 

Labor

bhisti

mixer operator

mixer

vibrator

0.10

 

1.63

0.70

0.07

0.07

0.07

6)Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement. (The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.)M3mason

 

Labor

bhisti

mixer operator

mixer

vibrator

0.17

 

2.00

0.90

0.07

0.07

0.07

7)Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement.M3mason

 

Labor

bhisti

mixer operator

mixer

vibrator

0.24

 

2.50

0.90

0.07

0.07

0.07

8)Mortars:

Mixing by hand, cement mortar of any mix/proportions (Labor required will be approximately same for different mix proportions.)

M3Labor

 

Bhisti

0.75

 

0.07

9)Brick work (straight walls):

Brick work in walls exceeding one brick thick, in cement / lime mortar (The constants include labor involved in scaffolding.)

M3mason

 

Labor

bhisti

0.94

 

1.80

0.20

10)Brick work in walls, one brick thick, in cement/lime mortar. (The constants could be adopted for brick work with any mix or mortar.)M2mason

 

Labor

bhisti

0.25

 

0.40

0.10

11)Formwork / Shuttering:

a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork:

1) rectangular column and walls

2) suspended floors/roofs

3) sides and soffits of beam

M3

 

M2

M2

Carpenter

 

Labor

Carpenter

Labor

Carpenter

Labor

0.25

 

0.20

0.23

0.20

0.30

0.20

12)Reinforcement:

Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete

QuintalBar bender

 

Labor

1.00

 

1.00

13)Plastering and pointing:

a) 15mm thick cement plaster to ceiling including mixing of mortar.

b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar

c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.

M2

 

M2

M2

mason

 

Labor

bhisti

mason

Labor

bhisti

mason

Labor

bhisti

0.08

 

0.10

0.10

0.06

0.10

0.10

0.10

0.15

0.10

14)Damping proof course:

a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.

M3Mason

 

Labor

bhisti

0.10

 

0.10

0.01

Note: Bhisti means water carrier.