Comments on: Analysis of Rates for Civil Engineering Works https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/ Sun, 02 Aug 2020 18:15:57 +0000 hourly 1 By: Tafheem https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-28100 Sun, 02 Aug 2020 18:15:57 +0000 https://theconstructor.org/?p=6488#comment-28100 What is “free lead” in govt. Rate analyses?

]]>
By: Manish Kumar https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-25226 Sat, 06 Feb 2016 13:19:36 +0000 https://theconstructor.org/?p=6488#comment-25226 discribe the factor affecting the rate analysis

]]>
By: Abhay Kumar https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-23708 Mon, 16 Mar 2015 11:20:42 +0000 https://theconstructor.org/?p=6488#comment-23708 The above notes and points discussed by the Constructor are very useful not only the civil engineers working but our students studying Civil engineering.
Materials cost, Labour cost, Sunderies , T & P , Specification and site coniditions are the main points to be known well for obtaining AOR

]]>
By: Mohammed Gouse Nadaf https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-22464 Sat, 27 Sep 2014 02:33:49 +0000 https://theconstructor.org/?p=6488#comment-22464 Locally available material to be taken in consideration by Architects for design of project so as to reduce the construction cost .Accordingly rate analysis can be evaluated for final cost of project.

]]>
By: Rizwan Hanif Mughal https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-22430 Wed, 24 Sep 2014 18:14:42 +0000 https://theconstructor.org/?p=6488#comment-22430 For the good analysis of rates the main thing is to use the accurate man hours, machine hours, Consumables etc. which may required to execute the work.
The Remaining Factors e.g. Material can be calculated easily.
Similarly the rates difference between Market and Government Journals can also be compared easily.

]]>
By: Rama Sarma https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-22409 Tue, 23 Sep 2014 06:05:25 +0000 https://theconstructor.org/?p=6488#comment-22409 it is worthy and useful article . The rates of labour of Govt is to be considered for dept tenders is must. but for other is optional. Govt also has its own yard sticks to be ascertained for estimate of cost. However the authoe has commendable effort has been put .Thanks

]]>
By: Tariq Khan https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-22401 Mon, 22 Sep 2014 13:18:34 +0000 https://theconstructor.org/?p=6488#comment-22401 VARY NICE PRESENTATION OF RATE ANALYSIS

& U CAN YOU STANDARD DATA BOOK (MORTH) FORMAT & INPUT MACHINERY & LABOR & MAIN POWER WHICH TO BE USE.

U CAN DOWNLOAD THE FOLLOWING LINK

]]>
By: Asif Jawaid https://theconstructor.org/construction/analysis-of-rates-for-civil-engineering-works/6488/#comment-22400 Mon, 22 Sep 2014 12:01:52 +0000 https://theconstructor.org/?p=6488#comment-22400 good hai

]]>